Home
All Services → Full Truckload (FTL) Partial Truckload (PTL) Flatbed & Open Deck Hazmat Shipping Heavy Haul & Oversized Project Cargo Refrigerated Freight Expedited Freight Power-Only Sprinter Van Box Truck Cross-Border Canada
All Industries → Heavy Manufacturing Steel & Metals Chemical & Industrial Oil, Gas & Petrochemical Energy & Utilities Renewable Energy EPC & Construction Building Materials Automotive Aerospace & Defense Food & Beverage Freight Forwarders
All Locations → Birmingham, AL Atlanta, GA Texas Tennessee Florida North Carolina Ohio Pennsylvania New Jersey New York Michigan Chicago, IL California Phoenix, AZ Seattle, WA
About Book Freight Security & Carrier Vetting
Contact (205) 855-6385 Quote Now →
Home/Project Cargo
Inland Project Cargo Trucking

Project
Cargo

Port to Jobsite · Multi-Axle · Permit Engineering · EPC & Forwarder Support

Heavy, oversized, and complex industrial freight coordinated from port or origin to final jobsite. Planned before quoted. Executed without surprises.

Project Cargo Is a Planning Problem First

Project cargo moves fail at the planning stage, not the execution stage. The transformer that won't clear a bridge. The pressure vessel permitted for the wrong axle configuration. The multi-piece shipment sequenced in the wrong order and delivered to a site that can't store it. These aren't execution failures — they're planning failures that showed up during execution.

We treat project cargo as an engineering problem before it becomes a logistics problem. Route analysis, equipment selection, permit engineering, weight distribution, and site coordination happen before a quote goes out. For forwarders and EPC contractors with clients behind them, that's not optional — it's the minimum standard.

What Project Cargo Actually Involves

The term gets used loosely. For us, project cargo means freight where at least one of the following is true:

If any of those apply, you need a broker that plans before pricing. Not one that books a carrier and hopes the details work out.

Equipment We Coordinate

RGN & Lowboy Removable gooseneck for drive-on or crane-set loading of heavy equipment. Lowboy for maximum deck-to-ground clearance on tall industrial cargo. Standard for most transformer and heavy machinery moves.
Multi-Axle Configurations Additional axles distribute load weight across more contact points to stay within bridge formula limits. 9-axle, 11-axle, and 13-axle configurations available depending on load weight and state routing requirements.
Steerable Rear Axles Hydraulic rear steering for tight turns at port terminals, plant gates, and job sites where a rigid trailer configuration can't maneuver. Required on some urban delivery routes and constrained site access points.
Beam & Stretch Trailers Extendable decks for unusually long cargo — structural columns, pressure vessel shells, transmission poles, and long fabricated components where overhang on a fixed deck creates a permit or safety problem.
Flatbed & Step Deck Open deck for loads that fall within or just outside standard dimensions. Step deck lowers the effective ride height by 12–18 inches for cargo that clears on a drop but not on a standard deck.
Escort & Pilot Cars State-certified escorts sourced, briefed, and coordinated before dispatch. Handoffs at state lines planned in advance so loads don't sit at borders waiting for the next escort to arrive.

Permit Engineering for Multi-State Project Moves

A project move crossing multiple states is not a single permit — it's a permit package for every state in the route, each filed separately, each with its own dimensional thresholds, fee structures, routing restrictions, and processing timelines. Getting this wrong adds days to a move and can result in fines, load holds, and missed site windows.

Port to Jobsite Moves

Most heavy industrial equipment arrives in the U.S. via vessel. Getting it from the port terminal to the final jobsite is where project cargo brokerage earns its value — or loses it.

Port environments have their own constraints: terminal outgate hours, overheight and overweight handling procedures, and release timing that rarely aligns perfectly with a carrier's schedule. Once cargo is released and ready to move, we take over the inland leg — equipment sourced, permits in hand, and delivery coordinated with the receiving site before the truck departs.

For Freight Forwarders

If you're managing the international leg and need a domestic inland partner for the U.S. truck move, we are built for that relationship. Forwarders have specific expectations that most domestic brokers don't understand or don't take seriously.

For EPC Contractors

Engineering, procurement, and construction firms move freight tied to project schedules that don't flex. A transformer that misses its delivery window doesn't just delay installation — it delays commissioning, which delays startup, which has a cost that dwarfs the freight invoice.

Industries We Serve

Electric Utilities & PowerTransformers, switchgear, and transmission infrastructure from port or manufacturer to substation. Among the most weight- and dimension-sensitive moves in the industry.
Oil, Gas & PetrochemicalPressure vessels, reactors, distillation columns, and process units for refineries and petrochemical plants. Often multi-piece and multi-state.
Heavy ManufacturingCapital equipment installation and plant relocation freight — presses, mills, CNC centers, and large fabricated structures.
Renewable EnergyWind turbine components, nacelles, and tower sections. Logistically among the most complex moves that exist — simultaneously long, wide, and heavy.
Construction & InfrastructureBridge girders, structural steel, modular building components, and large precast elements to active construction sites.
Freight ForwardersDomestic inland carrier partner for international project shipments. We understand the forwarder relationship and execute to the standard your clients expect.

What to Send Us

The more detail upfront, the better the plan and the more accurate the quote. For project cargo we want:

If you don't have all of this yet, call us anyway. We can help you identify what's needed before the planning process starts.

Get a Project Cargo Quote
(205) 855-6385
Fast response during business hours
Send Us the Specs →

Project Cargo FAQ

What makes project cargo different from standard heavy haul?
Heavy haul is a transportation challenge. Project cargo is a logistics coordination challenge that includes transportation. The difference is scope — project cargo involves planning around downstream dependencies, multi-piece sequencing, port coordination, site constraints, and often multiple parties with different schedules that all have to align.
How early should I contact you for a project cargo move?
As early as possible. For standard oversize moves, a few weeks is workable. For superloads, port-to-jobsite moves with complex routing, or multi-piece shipments with tight site windows, months of lead time is not excessive. The earlier we're involved, the more options we have.
Can you coordinate with our port agent and customs broker?
We coordinate the inland truck leg once the cargo is released and ready to move. Port clearance, customs, and terminal outgate are typically handled by the forwarder or their port agent — we pick up from there and manage the domestic transport end to end.
What is a superload and how long do permits take?
A superload generally refers to loads exceeding 16' wide, 16' tall, or 200,000+ lbs gross. These require state DOT engineering review in most states before permits are issued. Lead times range from two to six weeks depending on the state. Some states require bridge analysis letters that add additional time.
Do you handle multi-piece project shipments with sequenced delivery?
Yes. Coordinating multi-piece moves where delivery order and timing matter — matching a construction sequence, aligning with crane availability, or staging freight at a site that can't store everything at once — is part of what we do on project cargo.
We're a freight forwarder. What do you need from us to quote the domestic leg?
Load dimensions and weight, origin (port terminal or manufacturer), destination (full address with site constraints), delivery timeline or hard deadline, number of pieces, and any special handling or rigging requirements. The more you give us upfront, the faster and more accurate the quote — and the fewer surprises mid-move.
Complex move?
Send us the specs.
We plan before we quote. Dimensions, weight, origin, destination, timeline — the more detail upfront, the better the plan.
Send Us the Specs → Call (205) 855-6385